Rates
Rate Changes Effective January 1, 2020
Beginning with bills generated on or after January 1, 2020, you will see a $2.50 increase in the Basic Charge, along with a 2.5% increase in the kWh charge for December usage and thereafter. The Board of Directors concluded this adjustment is necessary due to lower electricity sales and needed system improvements.
Effective January 1, 2020, the rate schedule for typical 3 Phase service, compared to 2019, is below:
Basic Charge: | 2019 | 2020 | |
Up to 50 KW | $41.50 | $44.00 (per meter per month) | |
Over 50 KW | $86.50 | $89.00 (per meter per month) | |
Demand Charge: | 2019 | Â 2020 | |
First 50 KW | No Charge | No Charge | |
All KW over 50 KW | $6.50 | $6.50 per KW | |
 | |||
Usage Charge: | 2019 | Â 2020 | |
First 10,000 kWh | 9.96¢ | 10.21¢ per kWh | |
Next 50,000 kWh | 7.14¢ |  7.32¢ per kWh | |
All kWh over 60,000 kWh | 5.44¢ |  5.58¢ per kWh | |
Â
For more details about this change, click the links below:
Rate Increase for 2019_RESIDENTIAL (PDF)
Rate Increase for 2019_NON Residential (PDF)
Current 2019 Rates
General Service Single-Phase
Schedule GS-1
Applicable to all Lane Electric Cooperative consumers requiring underground or overhead single-phase electric service; subject to the established rules and regulations of Lane Electric.
To assure service quality, the capacity of single-phase motors served under this schedule cannot exceed 7½ horsepower.
General Service Single-Phase Commercial
Schedule GS-1C
Applicable to all Lane Electric Cooperative members requiring underground or overhead single-phase commercial electric service for uses at nominal service voltages of 120/240 volts; subject to the established rules and regulations of Lane Electric.
To assure service quality, the capacity of single-phase motors served under this schedule cannot exceed 7½ horsepower.
General Service Three-Phase
Schedule GS-3
Applicable to all Lane Electric Cooperative consumers requiring three-phase service; subject to the established rules and regulations of Lane Electric.
Remote Site Service
Schedule RS-1
Applicable to all Lane Electric Cooperative members requiring underground or overhead single-phase electric service to a remote site which meets all the following criteria: 1) not readily accessible year-round, 2) not a domicile or regularly occupied, 3) uses less than 70,000 kWhs per year, and 4) not subject to a specific service contract. To assure service quality, the capacity of single-phase motors served under this schedule cannot exceed 7½ horsepower.
Irrigation Service
Schedule IS-5
Applicable to all Lane Electric Cooperative consumers for separately metered service to be used solely for irrigation pumping from April through October, inclusive; subject to the established rules and regulations of Lane Electric.
Yard Lights
Schedule L-1
Applicable to permanent residential, farm or commercial customers of Lane Electric Cooperative.
Member-Owned Street Lighting Service
Schedule L-2
System type and design must be approved by Lane Electric Cooperative (LEC).
Street Lighting Service
Schedule SL-3
Applicable to incorporated towns, villages, and other governmental agencies for street and highway lighting requiring multiple lighting units.
Electric Vehicle Charging Station
Schedule EV-1
Applicable to all Lane Electric Cooperative consumers requiring three-phase service for electric vehicle charging stations; subject to the established rules and regulations of Lane Electric.