{"id":38586,"date":"2024-02-07T15:01:35","date_gmt":"2024-02-07T23:01:35","guid":{"rendered":"https:\/\/laneelectric.com\/?p=38586"},"modified":"2024-02-12T09:21:18","modified_gmt":"2024-02-12T17:21:18","slug":"net-metering","status":"publish","type":"post","link":"https:\/\/laneelectric.com\/net-metering\/","title":{"rendered":"Net Metering Member Comment Period"},"content":{"rendered":"
On February 28 from 9-9:30 a.m.<\/strong> Lane Electric will open up a comment period to hear from members regarding net metering limits for 2024.<\/p>\n To balance the interest of all members, the aggregated level of net metering generation for the cooperative in 2023 was limited to two percent of the system’s historic single-hour peak load (amount of energy consumed by members). Management and the Lane Electric Board of Directors are reviewing proposed projects and accessing a new cap of three percent for the current year.<\/p>\n Members, whether they have a net metered account or not, can share comments on this topic at the February board meeting.<\/p>\n Read Policy 311 – Net Metering Services<\/a><\/p>\n<\/div>\n Before starting a solar project contact Lane Electric’s Energy Services team at 541-484-1151 to ensure all projects comply with the cooperative’s standards.<\/p>\n<\/div>\n<\/div>\n <\/p>\n <\/p>\n <\/p>\n","protected":false},"excerpt":{"rendered":" Reassessing Net Metering Limits On February 28 from 9-9:30 a.m. Lane Electric will open up a comment period to hear from members regarding net metering limits for 2024. To balance the interest of all members, the aggregated level of net metering generation for the cooperative in 2023 was limited to two percent of the system’s […]\n","protected":false},"author":25,"featured_media":38587,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false,"footnotes":""},"categories":[218,4],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/posts\/38586"}],"collection":[{"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/comments?post=38586"}],"version-history":[{"count":30,"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/posts\/38586\/revisions"}],"predecessor-version":[{"id":38629,"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/posts\/38586\/revisions\/38629"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/media\/38587"}],"wp:attachment":[{"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/media?parent=38586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/categories?post=38586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/laneelectric.com\/wp-json\/wp\/v2\/tags?post=38586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}What Is Net Metering?<\/h3>
\n
\n
\n